In almost every traditional warehouse the biggest item in picking cost is the time spent walking. From how many order lines a day a goods-to-person system starts paying back, which multipliers move the numbers, and when it is better to stay with manual picking.

Goods-to-person automated warehouse: mobile robots bring shelves to picking stations, threshold and payback evaluation

In almost every traditional warehouse the biggest cost item in picking is a single one: the time operators spend walking. That is where to start when evaluating a goods-to-person system, because it is exactly the item automation goes after, and because the cost of manual picking can be measured well, with data the company already holds. Order lines per day, number of items and turnover, labor cost, space, shifts: these numbers, more than the technology, say whether a warehouse is a serious candidate, before anyone talks to a supplier. And the same numbers, read honestly, also say when goods-to-person isn't needed.

Why goods-to-person changes the picking equation

In a traditional warehouse the operator goes to the goods: walks the aisles, finds the location, picks, comes back. In a goods-to-person system the flow is reversed. Mobile robots lift shelves and bring them to picking stations, where the operator stays put and picks with software guidance. Wurman, D'Andrea and Mountz described this architecture in AI Magazine in 2008, in a paper that has remained a reference for the field. The reason it matters lies in the reference data of warehouse logistics. Tompkins and colleagues, as cited in the review by de Koster, Le-Duc and Roodbergen in the European Journal of Operational Research (2007), estimate that picking can account for up to 55% of a warehouse's operating cost. In traditional picking, the same source adds, travel takes about half of the operator's time.

Goods-to-person removes almost all of that item, which is why productivity per operator can rise sharply without asking anyone to move faster. The mobile-shelf manufacturer that DIPITECH represents states picking productivity up to three times the manual figure. It is an interested party's number, to be measured on your own line profile, and the goods-to-person automated warehouse page reports the conditions under which it is stated.

What walking costs you today

Every serious evaluation starts from the current cost of picking, and the formula only uses internal data. Annual picking cost is the number of dedicated operators multiplied by the hourly company cost and by the hours worked in a year. The walking share is that cost multiplied by the percentage of travel time, which without your own measurements can be estimated at around half, as in the literature just cited.

An example, declared as such. A warehouse with 6 operators dedicated to picking, on one 8-hour shift for 220 working days, uses 10,560 labor hours a year. If about half is travel, the company pays every year for more than 5,000 hours of walking, the equivalent of two or three full-time staff whose job consists of walking aisles. That is the quantity goods-to-person turns into picks: the same volume of lines is handled with fewer hours, or growing volume is absorbed without looking for people who can't be found. Picking errors come on top, each with its return and reshipment, and display-guided picking at the station reduces them.

Payback thresholds: order lines per day

The thresholds below are our own order of magnitude, derived from two written assumptions. The first is manual productivity of 65 lines per hour per operator, the same used in the example of our guide on choosing an automated warehouse, and the second is walking equal to half of picking time. At 150 lines a day picking takes just over two labor hours, and walking just over one: even removing all of it, the annual saving stays small. At 1,000 lines a day picking hours rise to about 15 and walking alone takes almost eight, a whole person every day. Between these two ends, the other variables decide.

Order lines per dayZoneReasoning
Below about 150-200Hard to justifyFew walking hours to recover; it pays only with high space value or multi-shift work
From about 200 to 1,000Evaluation zoneLabor cost, shifts, space, errors and expected growth decide: sizing on real data is needed
Above about 1,000Usually worthwhileRecovered hours dominate the calculation, and the real constraint often becomes finding operators

Lines alone are not enough, because the number of items and the turnover curve matter too. The profile that suits goods-to-person is a range from hundreds to tens of thousands of small and medium items with spread-out turnover, typical of e-commerce, spare parts, cosmetics, electronics and pharmaceuticals. With very few fast movers the right goods are always in front of the operator already, and a well-designed flow rack may be enough. With only slow movers there are few walking hours to recover in absolute terms. Goods-to-person pays where the mix forces operators onto long, fragmented routes today.

Which zone is your warehouse in?

Send us order lines per day, item count and floor plan, and we will tell you whether goods-to-person is in your payback zone or whether optimizing manual picking makes more sense. An assessment of your layout and flows, with a tailored quote within 24 hours.

Email us Message us on WhatsApp

Space, shifts and seasonality move the numbers

A calculation on picking alone, though, leaves out three multipliers. The first is space: mobile shelves remove most aisles and compact storage, and the manufacturer we represent states up to 30% of floor space recovered. Where the warehouse is full this can become the biggest saving of all, because it postpones an extension or a second site, or frees area for production. The second multiplier is shifts. The investment is spread over operating hours, so a system working two or three shifts earns two or three times the saved hours on the same capital. The third is seasonal demand. In busy periods a manual warehouse hires seasonal staff who have to be trained in a hurry, with worse productivity and more errors exactly when volume peaks. A modular goods-to-person system adapts by adding robots to the fleet instead. That scalability is hard to budget for, but very real in November.

That is why the serious answer to the payback question is sizing on real data, and why it pays to be wary of anyone promising a payback without having seen the data.

From data to payback

Lines, items, floor plan and organization are the basis for sizing the robot fleet, shelves and stations, and payback is calculated with a method: total investment, meaning system, integration and training, divided by the net annual saving. The saving adds up recovered picking hours times hourly cost, the value of freed space, fewer errors and less overtime and seasonal labor, net of the system's annual costs. The full method, with the hour conversion factor and volume sensitivities, is in our guide on choosing an automated warehouse.

A specific advantage of mobile-shelf systems is their installation profile. For standard systems the manufacturer states a physical installation of two to three weeks, possible because the robots follow floor references and no civil works or bolted fixed structures are needed. The overall project, with data analysis, WMS integration, training and fine-tuning, takes longer, and it is the part that decides the result.

The profiles where goods-to-person doesn't pay

The first wrong profile is too few lines. Below 150-200 lines a day the hours saved rarely justify the investment, and it is better to optimize routes, locations and order batching in manual picking. The second concerns oversized or very heavy items: the system works with items that fit the compartments and the load capacity of the mobile shelf, which the manufacturer states at 600 kg. Full pallets, long or heavy items call for robotic forklifts and AMRs for pallet handling or traditional solutions.

The third is a range of very few fast movers. If 90% of lines fall on a few dozen codes, a flow rack or a well-designed pick zone delivers most of the benefit at a fraction of the cost. The fourth is a flow dominated by full pallets in and out, where the issue is material handling and the right evaluation is AMR ROI and TCO. Very often the correct answer is hybrid: goods-to-person for fast-moving small parts, handling vehicles for pallets, conventional shelving for bulky slow movers.

Goods-to-person, conventional shelving and mini-load compared

CriterionConventional shelvingGoods-to-person (mobile shelves)Mini-load / AS/RS
Picking productivityBaseline, dominated by walkingHigh: operator stays put, goods come to the stationHigh, tied to fixed mechanics
Initial investmentMinimalIntermediate, modularHigh, structural
Lead timeImmediateWeeks for physical installationMonths, with civil works
GrowthBy adding peopleBy adding robots and shelvesRigid: sized at the outset
Layout reversibilityTotalHigh: no heavy fixed structureLow
Ideal profileLow volumes, mixed itemsMany lines on a medium-to-wide range of small and medium itemsVery high, steady volumes in standard containers

What to send us for an assessment

To place your warehouse in one of the three zones a few figures are enough, as long as they come from the host system rather than estimates:

  • order lines per day, with hourly and seasonal profile, ideally twelve months exported from the host system;
  • item master: number of items, case dimensions and weights, ABC turnover curve;
  • floor plan with clear heights and constraints such as columns, docks and served areas;
  • WMS or ERP in use and integration points;
  • organization: operators dedicated to picking, shifts, overtime and seasonal staff in busy periods.

You can send them by email to info@dipitech.com or on WhatsApp. The assessment returns a sizing with the return calculation method spelled out and, when that is the case, the conclusion that goods-to-person does not fit your profile. The available solutions are part of our industrial automation and robotic material handling offering. If the choice is still between transport and storage, the comparison of AGVs and AMRs helps separate the two problems.

Frequently asked questions about automated warehouse payback

How much does an automated warehouse cost?

There is no price that fits every case, because cost follows the technology chosen and the sizing on your data. The number of robots, shelves and stations matters, along with WMS integration, training and the system's annual costs, while fixed solutions add structures and civil works. We therefore start from order lines, SKUs and the floor plan: an assessment of your layout and flows, with a tailored quote within 24 hours.

How many order lines a day does a goods-to-person warehouse need to pay off?

As our own order of magnitude, below 150-200 lines a day it is hard and above 1,000 it usually pays. The check to run on your own data is a different one: how many hours a day your staff actually spend walking, measured over a typical week and a busy one.

How much space does a goods-to-person warehouse save?

The manufacturer DIPITECH represents states up to 30% of floor space recovered compared with shelving served on foot. The real figure depends on the starting layout: a warehouse with already narrow aisles recovers less than one designed for order picker trucks.

How long does a goods-to-person installation take?

The manufacturer states two to three weeks of physical installation for standard systems. It is wiser, though, to plan the project around the duration of WMS integration and fine-tuning, which depend on your host system more than on the equipment.

Does goods-to-person work with heavy or oversized items?

Not for those items: they need other solutions, such as robotic forklifts, AMRs for pallets or conventional racking. In practice the range is split, with fast-moving small parts going into goods-to-person and the rest left to suitable technologies.

How is the payback of an automated warehouse calculated?

Total investment divided by net annual saving, calculated on the hours that can really be removed rather than those saved on paper. The weak spot in many calculations is the value of space: it belongs in the numbers only if there is a real alternative, such as renting or extending, that the system makes it possible to avoid.